Completed Low Voltage

Mental Health Facility

Mental Health Facility

The new Mental Health facility is located at Wagga Wagga Base Hospital campus and consists of the construction of a new two level facility.

 

Project: Wagga Base Hospital – New Mental Health Building
Builder: Hansen & Yuncken
Time Frame: Approx. 8 months

Services provided within the new Mental Health facility:

 
A 30 bed high dependency mental health unit to the ground floor; ‐ a 20 bed sub‐acute mental health unit to the first floor.
 
Accommodation as specified for the management, treatment and care of patients.
 
Ground and first floor link structure connecting with the main hospital building emergency department and procedures centre.

Scope of Electrical and Communications Services Works:

 
The complete LV power supply system including consumer mains, sub‐mains, MSB, distribution boards, standby power, UPS system, PFC, surge protection, final sub‐circuits, related earthing systems, metering, cable trays.
 
Outlets and accessories including single and multiphase socket outlets, switching systems, single and multiphase permanent connections, lighting outlets, internal and external luminaires, exit and emergency lighting system, DALI lighting control etc.

 

BOOK AN ELECTRICIAN NOW

Image

GPE Electrical & Communications Contractor was formed in Albury on the 1st July 1988 and business expanded into the Wagga Wagga region with an office and workshop in 2001.

GPE Albury

 

GPE Albury Office
Address:
 12 Bennu Circuit, Albury, NSW 2640
Phone: (02) 6049 3900
Email: admin@gpe.com.au
GPE HV Albury Office
Address: 16 Bennu Circuit, Albury, NSW 2640
Phone:
 (02) 6043 6900
Email:
 admin@gpehv.com.au

GPE Wagga

 

neca Member
Image